Motorway Bridge A8: Moisture and Corrosion from the New Build
Project facts
- Structure type
- Motorway bridge, new build in a PPP project
- Installation
- Planned and installed by the concessionaire of the PPP project
- Task
- Observe moisture and corrosion at caps and joints over the warranty period
- Sensors installed
- Moisture and corrosion sensors, readable remotely via CorroDec 2G
Installed sensors
Challenge
Detecting damage before it becomes visible
The aim of the design was to detect damage in time, before it becomes visible. Whoever only reacts once the damage can be seen pays more for the concrete repair and needs longer closures. Three areas of the structure were critical here: the caps, the joints and the technologically induced weak points.
This project ran as a PPP project, which adds a second point: a very long warranty period was agreed for the structure. Over such a long period, it had to remain observable whether the surface protection systems used are working and how the technologically induced weak points develop.
Solution
Sensors that go into the concrete with the new build
The concessionaire of the PPP project planned and installed the sensors, in the new-build section. Moisture and corrosion sensors were placed specifically where the damage is expected: in the cap area, at the joints and at the technologically induced weak points.
The positions were chosen according to the damage expected there in future. The sensor therefore sits exactly where the damage will later occur.
Readout
From handheld reader to remote readout
Initially, the sensors were read out with a handheld reader, directly at the structure. That works, but it costs a site visit every time. With the CorroDec 2G sensor generation, the same measurement is conveniently possible remotely.
For the operator, this changes less about the readings themselves than about how they are handled. Inspection intervals can be steered by the data instead of by the calendar, repairs can target specifically the points where the surface protection system actually fails, and closures for later measures become shorter because the scope is known in advance.
Result
A measurement series that begins with the structure
The critical points of the structure have carried sensors since the new build. Over the warranty period, this makes it possible to observe how moisture and corrosion develop at caps and joints.
The project shows how concrete monitoring and moisture and corrosion monitoring work in bridge monitoring when they are planned in already during construction. If you are planning a structure or a repair and want to be able to prove its condition afterwards, describe your project to us through our project inquiry.
Specifics
- Installation points
- Caps, joints and technologically induced weak points of the new build
- Observation period
- Designed for the very long agreed warranty period of the project
- Readout
- Initially via handheld reader at the structure, with CorroDec 2G remotely
- Operational benefit
- Steer inspection intervals and shorten closures for later repairs
Products in use
Sensors installed here
Related solutions & industry
Solutions matching this project
Infrasolute platform
How the readings from this project are evaluated
The readings from this project come together on the Infrasolute platform. There they are checked against the defined limits, shown as trends and interpreted with AI.
Platform modules
Project inquiry
A comparable structure to monitor?
Describe your structure and your question. We recommend the right measuring points and suitable sensors.
More projects
More references in bridges
Project inquiry
Tell us about your structure
Structure type, location and your question are enough to start. We recommend suitable measuring points and sensors.
[email protected]