Motorway bridge in Hanau: live crack monitoring during heavy transports
Project facts
- Structure
- Motorway bridge in Hanau, concrete superstructure with longitudinal and cross girders on circular columns
- Client
- Ingenieurbüro Kloos, Wetzlar
- Reason
- Existing cracks in the cross girders, several heavy transports a day for the construction of the SuedLink power line
- Task
- Record crack movements live during heavy vehicle crossings
- Installed sensors
- Crack Sensor Live with displacement transducers on the cross girders, live gateway with solar module
Installed sensors
At a glance
- Structure: motorway bridge in Hanau, concrete superstructure with longitudinal and cross girders on circular columns
- Client: Ingenieurbüro Kloos, Wetzlar
- Reason: existing cracks in the cross girders, plus several heavy transports a day for the construction of the SuedLink power line
- Solution: live crack monitoring with the Crack Sensor Live, switched on and off by SMS
- Power supply: live gateway with a solar module on the cross girder
Challenge
Heavy transports over a bridge with cracks
The motorway bridge in Hanau has existing cracks in the cross girders above the columns. They are marked on the structure and labelled with their crack widths. On its own, this is a matter for routine bridge inspection. What is unusual is the current loading: several heavy transports a day are crossing the bridge for the construction of the SuedLink power line. That many heavy vehicle crossings in a short period are the exception for the structure.
For the client, the engineering consultancy Ingenieurbüro Kloos, this raised the question of how the existing cracks respond to each crossing, and whether they change while the transports continue. A crossing lasts only seconds. One reading per hour would not show it.
Solution
Live crack monitoring that is switched by SMS
Infrasolute installed displacement transducers of the Crack Sensor Live across the cracks in the cross girders. They record the change in crack width with a resolution of 0.001 mm at 1 to 10 Hz, fast enough to resolve short load events such as a vehicle crossing. The readings travel by cable to the live gateway on the cross girder and from there over LTE to the Infrasolute platform.
What makes this project special is the control. Live measurement in continuous operation generates data around the clock, including the many hours without a heavy transport. The live monitoring can therefore be switched on and off by SMS at the client’s request. When it is switched on, the duration is set, and the measurement then switches itself off. The client can, for example, start the measurement in the evening before the transports, and it ends after the set time without anyone having to intervene.
SMS
switch live measurement on and off, set the duration when switching on
1–10 Hz
sampling rate of the Crack Sensor Live
0.001 mm
resolution of the displacement transducers
Solar
power supply of the live gateway on the cross girder
Installation
Installation from an aerial work platform
The cross girders are above a road that runs under the bridge. The sensors were installed from a truck-mounted aerial work platform, with traffic below continuing under traffic management. The displacement transducers are screwed on both sides of the crack, and the cables run along the cross girder to the live gateway. Power comes from a solar module mounted on the side of the cross girder. The measurement does not need a mains connection.
Benefit for the client
Measuring when the load arrives
The client receives live data from exactly the time windows in which the heavy transports run. The platform shows how far the cracks open during a crossing and whether they return to their initial position afterwards. Outside the measurement windows, no data piles up that nobody evaluates. For assessing the structure while the SuedLink transports continue, Ingenieurbüro Kloos has a targeted and manageable data basis.
More on the technology: crack monitoring in live and long-term variants, the Crack Sensor Live and traffic load monitoring for bridges under heavy traffic.
Specifics
- Control
- Switch live measurement on and off by SMS, set the duration when switching on
- Sampling rate
- 1 to 10 Hz, short load events such as a crossing are resolved
- Resolution
- 0.001 mm change in crack width
- Power
- Solar module on the cross girder, no mains connection required
Products in use
Sensors installed here
Related solutions & industry
Solutions matching this project
Infrasolute platform
How the readings from this project are evaluated
The readings from this project come together on the Infrasolute platform. There they are checked against the defined limits, shown as trends and interpreted with AI.
Platform modules
Frequently asked questions: Live crack monitoring Hanau
Why use live crack monitoring during heavy transports?
How does switching on and off by SMS work?
Why does the live measurement not run continuously?
What does the SuedLink power line have to do with the bridge?
Project inquiry
A comparable structure to monitor?
Describe your structure and your question. We recommend the right measuring points and suitable sensors.
More projects
More references in bridges
Project inquiry
Tell us about your structure
Structure type, location and your question are enough to start. We recommend suitable measuring points and sensors.
[email protected]