Strut monitoring in an excavation: how the monitoring works

Schematic drawing of a pipe strut between two retaining walls with vibrating wire gauges, data logger and a section showing three gauges spaced at 120 degrees

Project facts

Type
Application example: typical procedure, not a single project
Structure
Excavation with retaining wall and pipe or rolled-section struts at one or more levels
Task
Record and assess the axial force in selected struts from installation to removal
Measuring principle
Strain in the steel with vibrating wire gauges, axial force from modulus of elasticity and cross-section
In addition
Tilt of the retaining wall, vibration at neighbouring buildings, water levels

At a glance

  • Type: application example showing the typical procedure, not a single project
  • Structure: braced excavation with pipe or rolled-section struts at one or more levels
  • Task: record the axial force in selected struts from installation to removal and check it against thresholds
  • Sensors: vibrating wire strain gauges on the struts, plus tilt sensor, vibration sensor, water level sensor and groundwater sensor
  • Result: the load in each monitored strut as a time series on the platform, with warning and alarm levels

Background

Struts carry the load you cannot see

In a braced excavation, the soil, often together with the groundwater, pushes against the retaining wall from outside. Walers collect this load and pass it to the struts, which brace the opposite walls against each other. How large the force in a strut actually is depends on the ground, the excavation level, the preload and the temperature. It cannot be seen from outside.

Strut monitoring makes this force measurable. It shows whether the struts behave as assumed in the design and reports when a strut takes more load than intended. This protects the excavation, neighbouring buildings and the people working in it.

Measuring principle

From strain in the steel to strut load

A vibrating wire strain gauge measures the change in length between two fixing points on the steel. If the strut is compressed further, the steel shortens, and the wire in the gauge changes its tension and therefore its frequency. The mean of the strains from all gauges in a section, multiplied by the modulus of elasticity and the cross-sectional area, gives the axial force. The differences between the gauges show whether the strut is also subject to bending.

Schematic drawing of a pipe strut between two retaining walls with waler, vibrating wire gauges at a distance from the strut end, data logger with gateway and a section showing three gauges spaced at 120 degrees
Schematic illustration: pipe strut with three vibrating wire gauges spaced at 120°, at a distance from the strut end. The mean of the strains gives the axial force N.

Procedure

How strut monitoring works

  1. Plan the measuring sections: together with the structural and geotechnical engineers, it is decided which struts will be monitored, for example the most heavily loaded ones and struts in corners or close to sensitive neighbouring buildings. Warning and alarm levels are derived from the design for each monitored strut.
  2. Install the gauges: on pipe struts, usually three gauges are spaced at 120° around the circumference; on H and I sections, at least four, in pairs either side of the neutral axis. They are fitted at a distance from the strut ends, where the force flow is uniform. Where arc welding is not permitted, a spot-weldable version is available. A cover protects against direct sunlight and damage during construction.
  3. Zero reading: before the strut is loaded, the system records the initial state. All later readings refer to it.
  4. Preloading and excavation: the force rises sharply during preloading and continues to grow with every further excavation step. The platform shows the curve for each strut and level, so every construction step can be traced in the data.
  5. Construction stage: over days and weeks, a daily cycle appears. Struts restrained between the walls take on a real additional force as they warm up. The thermistor in each gauge makes this share visible.
  6. Warn and alert: when a strut reaches its warning level, a notification goes to the people responsible. At the alarm level, the measures agreed in advance take effect.
  7. Removal and report: when the struts are removed, the measurement shows how the load is redistributed. The end result is complete documentation of the strut loads over the entire construction period.
Schematic curve of strut load over the construction period: zero reading, rise during preloading, further rise during excavation, daily cycle during the construction stage below the warning and alarm levels, drop during removal
Schematic curve of strut load over the construction period, without measured values. The dashed lines represent the warning and alarm levels.

3 × 120°

gauges per pipe strut

≥ 4

gauges per H or I section

< 1 µε

resolution of the vibrating wire gauge

2 levels

warning and alarm level per strut

Overall system

Struts are one part of excavation monitoring

Strut load alone does not answer every question. If the retaining wall tilts while the strut loads remain normal, the cause may lie at the toe of the wall. If the groundwater rises, the pressure on the retaining wall increases. That is why all measured values from the excavation come together on the platform.

Section through a braced excavation with vibrating wire gauges on the struts, tilt sensor at the wall head, vibration sensor at a neighbouring building, water level sensor in the pump sump and groundwater sensor in the standpipe, connected via data logger and gateway
Schematic illustration of an excavation measuring system. The numbers correspond to the list below.
  1. Vibrating wire strain gauges on the struts: strut load per level
  2. Tilt sensor at the wall head: tilt of the retaining wall
  3. Vibration sensor at neighbouring buildings: vibration to DIN 4150-3
  4. Water level sensor in the pump sump: water level in the excavation
  5. Groundwater sensor in the standpipe: groundwater outside the excavation

The page Excavation monitoring explains how the components work together and which questions clients and site management should clarify in advance.

Benefits

What strut monitoring delivers

  • Safety during construction: an overload shows up as a trend before it becomes critical. There is time to stop excavation or add bracing.
  • Confirmation of the design: the measured forces show whether the design assumptions hold true and provide the basis for decisions under the observational method.
  • Clear responsibilities: warning and alarm levels, recipients and measures are agreed in advance. Nobody has to improvise in an emergency.
  • Documentation: the complete record of all strut loads is available for questions about neighbouring buildings or at acceptance.

Read more

Solutions and products for excavations

Specifics

Measuring section
Pipe strut: three gauges spaced at 120°, rolled section: at least four
Reference
Zero reading before the strut is loaded
Temperature
Thermistor in every gauge, the daily cycle becomes visible and can be assessed
Thresholds
Warning and alarm level per strut from the design, notification to the site management

Infrasolute platform

How the readings from this project are evaluated

The readings from this project come together on the Infrasolute platform. There they are checked against the defined limits, shown as trends and interpreted with AI.

Platform modules

The platform at a glance
3D model of a monitored building on the Infrasolute platform
Sample view
FAQ

Frequently asked questions: Strut monitoring in excavations

How many vibrating wire gauges does a strut need?
For pipe struts, usually three, evenly spaced at 120° around the circumference. For H and I sections, at least four, in pairs either side of the neutral axis. The mean of the strains gives the axial force, and the differences between the gauges show whether the strut is also subject to bending.
When is the zero reading taken?
Before the strut is loaded, that is after installation and before preloading. All later readings refer to this state. Without a zero reading, the strut load can only be stated as a change, not as an absolute value.
Why does the strut load change over the day?
Because steel tends to expand when it warms up. If the strut is restrained between the retaining walls, this creates a real additional force that rises during the day and falls again at night. The thermistor in each gauge records the temperature so that this share can be identified and taken into account in the assessment.
Who sets the warning and alarm levels?
The structural engineers and geotechnical engineers derive them from the design of the excavation, usually for each monitored strut. Infrasolute stores the values on the platform. If the observational method is used, the thresholds and the prepared measures form part of the design.
What happens if a threshold is exceeded?
The platform immediately notifies the people responsible, such as the site management, specialist site supervision and structural engineers. The measure that follows is agreed in advance, for example an on-site check, stopping excavation or installing additional bracing.

Project inquiry

A comparable structure to monitor?

Describe your structure and your question. We recommend the right measuring points and suitable sensors.

Project inquiry References
Benedikt Seuss Benedikt Seuss

Project inquiry

Tell us about your structure

Structure type, location and your question are enough to start. We recommend suitable measuring points and sensors.

[email protected]
Project inquiry